Public Notice-City offices are closed November 28th and 29th for Thanksgiving. More Info

Posts Tagged With: “Sealed Bids”


INVITATION TO BID – 2016 Citywide Paving and Curb Ramp Installation

INVITATION TO BID Sealed bids for the City of New Castle 2016 Citywide Paving and Curb Ramp Installation will be received by the City Administrator until 1:30 p.m. on Tuesday, November 22, 2016, at the City Administration Building, 220 Delaware Street, New Castle, at which time they will be publicly opened and read.  Bids received after the stated time will be returned unopened.  The Contractor shall begin work on or about March 15, 2017. Project has three components.  First is the installation of new curb ramps and the renovation of existing ramps located in both brick and concrete sidewalks.  Sloping for ramps and modification of adjacent areas for smooth transitions to ramps will be required as will detectable warning surfaces (truncated dome blocks).  Upon completion, all ramps installed or renovated shall be in compliance with the Americans with Disabilities Act (ADA) requirements and guidelines. The second is the placement of […]



Read More...

Invitation to Bid – City of New Castle Riverfront Redevelopment Pier Project

INVITATION TO BID Sealed bids for the City of New Castle Riverfront Redevelopment Pier Project will be received by the City Administrator until 1:30 p.m. on Thursday March 31, 2016, at the City Administration Building, 220 Delaware Street, New Castle, at which time they will be publicly opened and read.  Bids received after the stated time will be returned unopened.  This project was first bid in December 2015 but a contract was not awarded. The City of New Castle Riverfront Redevelopment Pier Project involves the construction of a fixed dock structure along the Delaware River to accommodate commercial, institutional, and historic vessels.  The fixed dock will extend from the Delaware Street Wharf approximately 170 feet to the navigable channel.  The project will include a fixed 100 foot long dock, access causeway, access ramp and stairs.  The construction will involve mobilization / demobilization; installation of driven piles; erection of steel framing […]



Read More...